Farmland, pasture, brownfield

Lease your land for a solar farm: rent, conditions, agrivoltaics.

Several hectares, farmed or idle? Ground-mounted solar or agrivoltaics lets you combine farming with a rent, with no investment on your side.

Reply within 48 hours from an engineer · Free · No commitment

Large agricultural plot suited to ground-mounted solar or agrivoltaics
30,000
landowners supported
100,000
plots analysed
4 GWp
of projects secured
350
partner developers and investors
In short

The essentials in four answers.

Who pays?

The developer pays for the studies, the works and the grid connection. You invest nothing.

What do you receive?

A steady rent fixed in the contract, for 20 to 40 years. In some countries, such as Italy, a sale or a surface right is also common.

How much does a hectare earn?

The rent depends on the area, the region and the distance to the grid. For a site in France, the free rent calculator below gives a range in a minute.

Can farming continue?

With agrivoltaics, yes: crops and grazing continue under the panels and farming stays the main activity. On idle or degraded land, ground-mounted solar is the alternative.

Agrivoltaics

Producing energy without giving up farming.

Agrivoltaics combines agricultural production and solar electricity on the same plot. The panels are raised (fixed or tracking structures) or placed between the rows, so that farming stays at the heart of the project.

The aim: secure an additional income without giving up production, while protecting crops and herds against a changing climate. A well-designed project strengthens the farm instead of replacing it. On plots that are idle, derelict or barely used, ground-mounted solar remains the alternative, with a regular rent.

Rules differ from one country to the next. The conditions listed here are those applied in France; the engineer who reviews your site tells you what applies where your land is.

The conditions of an agrivoltaic project
  • Provide a service to the plot: protection against weather hazards, animal welfare, agronomic potential or water resources
  • Maintain significant agricultural production as the main activity
  • Guarantee that the installation is reversible at the end of the contract
  • In France, fit within the framework of the 2024 agrivoltaics decree
For the farmer

What agrivoltaics changes for your farm.

A stable additional income

Regular rent for 20 to 40 years, independent of harvests and of agricultural prices.

Protected crops

Controlled shading against scorching, water stress, hail or frost, depending on the structure chosen.

Better animal welfare

Shade and shelter for the herd, which reduce heat stress and support production.

Water preserved

Less evapotranspiration under the panels, an asset in areas exposed to drought.

No investment

Everything is financed by the developer. The study, the installation and the operation cost the owner nothing.

A farm that carries on

Farming remains the priority. The property gains value and is easier to pass on.

Which land?

Farmed, idle or degraded: three situations.

Farmland and pasture

Several hectares, cultivated or grazed. Agrivoltaics combines the rent with a farming activity that continues under or between the panels.

Fallow or unused land

Land that is no longer farmed can host a ground-mounted solar farm and regain economic value.

Brownfield and degraded land

Former quarries, wasteland, polluted or sealed ground. These sites avoid farmland and natural areas, which makes projects easier to accept. Site restoration is written into the contract from the start.

Which activities?

Crops or livestock, the project adapts.

The type of structure and of cover depends on your activity. These are the main cases our engineers study.

Crops

Structures that let light through and leave room for machinery, sized for your crop rotation.

  • Arable crops: wheat, barley, rapeseed, sunflower, maize
  • Specialised crops: vines, orchards (apples, kiwi), market gardening, soft fruit
  • Hay meadows and fodder crops

Livestock

Raised panels that give the herd shade and shelter, while grazing continues.

  • Sheep: grazing under panels, the most common case
  • Cattle
  • Goats
  • Free-range poultry runs
How it works

Three steps, and you stay in control.

01

You describe your site

Online, in five minutes: country, location, surface and current use.

02

An engineer replies within 48 hours

They tell you plainly whether there is a project, and which one.

03

You choose your developer

We introduce the developers whose criteria match your site, and support you until signature.

Why go through Solmeria

An independent partner, on your side.

Free for you

The assessment and the introduction cost you nothing. The developer pays for studies, works and grid connection.

An engineer, then a call

An engineer reviews your site, then someone from the team calls you to understand your project.

Three developers at most

Your site is shown to developers whose criteria it matches, not to the whole market. No flood of calls.

You stay free

You talk to developers directly and you choose. Submitting a site commits you to nothing.

Your questions

Can I keep farming my plot?

Yes, that is the principle of agrivoltaics: grazing under the panels, protected crops, controlled shading. Farming remains the main activity.

What is the minimum area?

Ground-mounted solar generally starts from about one hectare. A smaller plot close to the grid can suit battery storage instead.

Is fallow, degraded or polluted land suitable?

Yes, and it is often ideal: former quarries, wasteland and polluted or abandoned ground are priority sites for ground-mounted solar. Fallow land can host a project too.

Can woodland be cleared for a solar farm?

No. We are opposed to deforestation. Solar is only considered on land that is already open or degraded.

When does the rent start?

In France, the first rents are generally paid when construction of the plant starts, about two to three years after the project is launched. A conventional ground-mounted farm needs that time for studies, permits, grid connection and construction.

What happens to the land at the end of the lease?

Dismantling and restoration of the land are provided for in the contract from the start.

Is your land suited to a solar farm?

Describe it in five minutes. An engineer replies within 48 hours, free of charge, with no commitment.

Have my land assessed →
← All site types

Developer, IPP, investor?

Every Monday at 2pm Paris time, Solmeria’s deal flow: prequalified land with motivated owners, and projects for sale from greenfield to RTB, across Europe.

Access the developer space →
PV opportunities a week
40
BESS opportunities a week
20
partners
350