19 ha of grassland in an agricultural zone (zone A), sheep agri-PV project, medium-voltage line 100 m away.
Landowners who want a project. Not lists of plots.
We identify the sites, qualify the land (zoning, grid connection, area, solar resource) and the landowner’s project, then put you in touch with the landowner. Around thirty greenfield opportunities a week across France, and around ten in Italy.
Free access on request · New opportunities every Monday at 2 pm (Paris time) · You only pay on projects that move forward

The deal flow in figures.
New opportunities go online every Monday at 2 pm (Paris time).
- Around thirty new opportunities a week in France, around ten in Italy
- 2,200 opportunities online in France
- 95 opportunities online in Italy
- Two thirds agri-PV, 80 to 90% of them with owner-occupier farmers
- One third outside agri-PV: brownfield, degraded land and other sites
- An average area of 15 to 20 ha
What a site report contains.
The preview card is visible without a contract. The detailed site report opens once you have signed the specific terms for ground-mounted PV and agri-PV. Before purchase, the location is given to municipality level only.
- A write-up of our conversation with the landowner: profile, activity, project, contact preferences, any discussions already held with other developers
- The land: area, current use, aerial view, slopes and elevation profile
- Planning: the zone under the PLU (local zoning plan) and a link to its regulations
- Agricultural history: the crops declared under the CAP (EU Common Agricultural Policy) over several years
- Grid connection: distance to and capacity of the poste source (primary substation), distance to the HTA (medium-voltage) line, grid availability
- Environmental constraints: protected areas, wetlands, flood risk, heritage
- A map for each section
Example site reports.
30 ha of grassland, organic cattle farm, primary substation less than 3 km away.
3.7 ha of brownfield in a zone earmarked for development, primary substation 100 m away, no CAP declaration.
An initial fee per site report, then three milestones.
An initial fee per site report to obtain the landowner’s contact details, then a fee per MWp at three milestones: land secured, permit cleared of appeals, final land deed. The fee is the same however the project is monetised. Storage sharing the same grid connection point incurs no separate fee. An exclusivity option is available on any site report.
Near your existing projects
Tell us where you are developing: we send you the opportunities within 20 km of your projects in development.
Faster than greenfield
On the marketplace: lease-option buy-outs and more advanced projects, up to RTB.
See the marketplace →Site report, access, fees.
What does a ground-mounted PV or agri-PV site report contain?
A write-up of our conversation with the landowner, the land, planning, agricultural history, grid connection and environmental constraints, with a map for each section.
What can I see before signing the specific terms?
The preview card for every opportunity is visible without a contract. The detailed site report opens once you have signed the specific terms for ground-mounted PV and agri-PV. Before purchase, the location is given to municipality level only.
How many developers is the same site report offered to?
Three partners at most per site report. An exclusivity option is available on any site report.
When is the fee due?
An initial fee per site report gives you the landowner’s contact details. A fee per MWp then falls due at three milestones: land secured, permit cleared of appeals, final land deed.
Is storage attached to the PV project charged separately?
No. Storage sharing the same grid connection point incurs no separate fee.
Set your criteria. Receive the opportunities that match.
Free access on request · New opportunities every Monday at 2 pm (Paris time) · You only pay on projects that move forward