BESS land origination

BESS land that can connect at medium voltage. Around 20 sites a week.

Prequalified sites in France (zoning, grid connection, risks), with landowners who want a project. 1 to 5 MW tapped on an HTA (medium-voltage) line, 6 to 16 MW next to a poste source (primary substation). 92 sites online today.

Free access on request · New opportunities every Monday at 2 pm (Paris time) · You only pay on projects that move forward

Prequalified BESS land that can connect at medium voltage
Medium-voltage focus

Two size bands, both connected at medium voltage.

Small-BESS, 1 to 5 MW

Sites in the immediate vicinity of an HTA (medium-voltage) line, connected by tapping onto the line.

Large-BESS, 6 to 16 MW

Sites in the immediate vicinity of a poste source (primary substation), connected directly to it.

Mini-BESS, under 1 MW

Occasionally. It is not the priority.

Solmeria study · November 2026

Why Small BESS on HTA is the segment to target

Out of 938 batteries in operation in France, only 37 are 2 to 5 MW. The study puts figures on this segment still to be built: land available near the HTA grid, development timelines, battery revenues and project prices.

of 11,194 plots within 200 m of an HTA line: pick the easiest to permit and connect
6,419
only within 1 km of a primary substation
264
to develop a Small BESS, versus 24 to 36 on HTB
9 to 18 months
per MW earned in twelve months by a 2-hour battery
€328k
A BESS site report

What a BESS site report contains.

Each site is documented section by section before it is presented to you.

  • Key points: a summary of the site in a few bullet points
  • Context: the landowner and their expectations
  • Grid connection: scenarios compared (medium-voltage tap, dedicated feeder, high voltage), injection and withdrawal capacities, saturation status, tariff zone, neighbouring substations with their connection queue
  • Site and land: areas, plot history
  • Planning: a reading of the PLU (local zoning plan), easements and requirements, any caveats on whether the use is permitted
  • Environment and risks: protected areas, wetlands, risk prevention plans, heritage
  • Topography, access and safety: slopes, heavy-vehicle access, nearest dwelling
  • Open points: ranked by impact, with the sources cited section by section
What we bring

Qualified leads, not lists of plots.

  • Genuinely motivated landowners who want a project on their site: a strong chance of signing and of securing the land.
  • Land prequalified in advance (zoning, grid connection, risks): a strong chance of obtaining the permits.
  • Less time wasted on sites that will never come to anything, and a better conversion rate.
Anonymised examples

What an opportunity looks like.

Around 3.8 MW symmetrical in a non-saturated zone. Medium-voltage feeder at the plot boundary, primary substation around 1.2 km away. 0.3 to 0.4 ha in an urban zone (zone U), nearest dwelling around 350 m away.

63 kV primary substation 100 m away, dedicated medium-voltage feeder. 0.5 ha in a business park, flat land, heavy-vehicle access. No developer contacted yet.

Immediate vicinity of the primary substation. Industrial estate adjoining the plot, no residential neighbours.

Immediate vicinity of the primary substation. Agricultural zone (zone A) of the PLU, which allows facilities of collective interest provided they do not harm farming activity. Highly committed landowner.

See an anonymised example dossier (PDF, in French) →

Fees

An initial fee per site report, then three milestones.

An initial fee per site report to obtain the landowner’s contact details, then three milestones: land secured, at a flat fee set by size category; signature of the PTF (the grid operator’s connection offer), per MW; final deed, per MW. The fee is the same whatever the BESS configuration and however the project is monetised. You remain free to prospect other sites that connect to the same substation.

Frequently asked questions

Sizes, site report, fees.

  • Which BESS sizes do you cover?

    The focus is medium voltage: Small-BESS of 1 to 5 MW tapped on an HTA (medium-voltage) line, Large-BESS of 6 to 16 MW next to a poste source (primary substation). Mini-BESS under 1 MW appear occasionally and are not the priority.

  • How many new BESS sites are published each week?

    Around 20 new sites a week in France, online every Monday at 2 pm (Paris time).

  • What does a BESS site report contain?

    A summary, the landowner’s context, the grid connection scenarios compared, with injection and withdrawal capacities and saturation status, the site, planning, environment and risks, topography and access, then the open points ranked by impact, with the sources cited.

  • How are BESS fees structured?

    An initial fee per site report to obtain the landowner’s contact details, then three milestones: land secured, signature of the PTF (the grid operator’s connection offer), final deed. The fee is the same whatever the BESS configuration and however the project is monetised.

  • Can I prospect other sites around the same substation?

    Yes. You remain free to prospect other sites that connect to the same substation.

All developer questions →

Around 20 new BESS sites a week, in France.

Free access on request · New opportunities every Monday at 2 pm (Paris time) · You only pay on projects that move forward

See the BESS opportunities →A question first? Talk to us →