Small-BESS, 1 to 5 MW
Sites in the immediate vicinity of an HTA (medium-voltage) line, connected by tapping onto the line.
Prequalified sites in France (zoning, grid connection, risks), with landowners who want a project. 1 to 5 MW tapped on an HTA (medium-voltage) line, 6 to 16 MW next to a poste source (primary substation). 92 sites online today.
Free access on request · New opportunities every Monday at 2 pm (Paris time) · You only pay on projects that move forward

Sites in the immediate vicinity of an HTA (medium-voltage) line, connected by tapping onto the line.
Sites in the immediate vicinity of a poste source (primary substation), connected directly to it.
Occasionally. It is not the priority.
Out of 938 batteries in operation in France, only 37 are 2 to 5 MW. The study puts figures on this segment still to be built: land available near the HTA grid, development timelines, battery revenues and project prices.
Each site is documented section by section before it is presented to you.
Around 3.8 MW symmetrical in a non-saturated zone. Medium-voltage feeder at the plot boundary, primary substation around 1.2 km away. 0.3 to 0.4 ha in an urban zone (zone U), nearest dwelling around 350 m away.
63 kV primary substation 100 m away, dedicated medium-voltage feeder. 0.5 ha in a business park, flat land, heavy-vehicle access. No developer contacted yet.
Immediate vicinity of the primary substation. Industrial estate adjoining the plot, no residential neighbours.
Immediate vicinity of the primary substation. Agricultural zone (zone A) of the PLU, which allows facilities of collective interest provided they do not harm farming activity. Highly committed landowner.
An initial fee per site report to obtain the landowner’s contact details, then three milestones: land secured, at a flat fee set by size category; signature of the PTF (the grid operator’s connection offer), per MW; final deed, per MW. The fee is the same whatever the BESS configuration and however the project is monetised. You remain free to prospect other sites that connect to the same substation.
The focus is medium voltage: Small-BESS of 1 to 5 MW tapped on an HTA (medium-voltage) line, Large-BESS of 6 to 16 MW next to a poste source (primary substation). Mini-BESS under 1 MW appear occasionally and are not the priority.
Around 20 new sites a week in France, online every Monday at 2 pm (Paris time).
A summary, the landowner’s context, the grid connection scenarios compared, with injection and withdrawal capacities and saturation status, the site, planning, environment and risks, topography and access, then the open points ranked by impact, with the sources cited.
An initial fee per site report to obtain the landowner’s contact details, then three milestones: land secured, signature of the PTF (the grid operator’s connection offer), final deed. The fee is the same whatever the BESS configuration and however the project is monetised.
Yes. You remain free to prospect other sites that connect to the same substation.
Free access on request · New opportunities every Monday at 2 pm (Paris time) · You only pay on projects that move forward