Must a French car park be fitted with solar canopies?
France's APER law requires outdoor car parks over 1,500 m² to cover at least half their surface with solar canopies. Existing car parks of 10,000 m² or more were due by 1 July 2026, those of 1,500 to 10,000 m² are due by 1 July 2028. Since the law of 26 November 2025, a deferral to 1 January 2028 or 2030 is possible under conditions. A third-party investor can fund the installation and pay you a rent.
- Free
- No sign-up
- Public sources, with dates
Your result
Your situation, the deadline and the area to cover
Fill in the form: the result appears here, without leaving the page.
Next step
A tool gives an order of magnitude. A site assessment by our team pins down the real potential, free of charge.
Method and sources
Rules from article 40 of French law no. 2023-175 of 10 March 2023 (APER law), as amended by law no. 2025-1129 of 26 November 2025, decree no. 2024-1023 of 13 November 2024 and decree no. 2026-842 of 7 September 2026 (panel criteria for the deferral).
Possible exemptions cover technical, safety, architectural, heritage or environmental constraints, or an economically unacceptable cost. They are justified case by case.
Indicative capacity assumes about 1 kWp per 6 m² of canopy. A site study refines this figure.
Frequently asked questions
Which car parks does the APER law cover?
Outdoor car parks over 1,500 m², existing or new. At least half their surface must be covered with canopies that include a renewable energy process.
What is the deadline to equip a car park?
1 July 2026 for existing car parks of 10,000 m² or more, 1 July 2028 for those of 1,500 to 10,000 m². A deferral to 1 January 2028, or 1 January 2030 for car parks of 1,500 to 10,000 m², is possible if a contract with a deposit and an order for compliant panels were signed within the legal time limits.
Do I have to fund the canopies myself?
No. A developer or third-party investor can fund and run the installation and pay you a rent or supply cheaper electricity.