Does a French municipality have solar acceleration zones?

Renewable acceleration zones (ZAER) are the areas each French municipality has identified as favourable to renewables, under the 2023 APER law. About 41,700 zones target ground-mounted solar. Pick a municipality to see its zones.

  • Free
  • No sign-up
  • Public sources, with dates
Type at least two letters, then pick from the list.

Your result

The zones published for ground-mounted solar, rooftops and car-park canopies

Fill in the form: the result appears here, without leaving the page.

Next step

A tool gives an order of magnitude. A site assessment by our team pins down the real potential, free of charge.

Method and sources

Zones are read live from the national acceleration-zone layer published by IGN on the Géoplateforme, fed by the French renewable planning portal.

Only zones attached to the chosen municipality are shown. The exact outline of each zone is on the national portal or at the town hall.

An acceleration zone is not a permit: a project still needs its building permit, environmental studies and grid connection.

Frequently asked questions

  • What is a renewable acceleration zone in France?

    An area a municipality considers favourable to renewable energy, created by the APER law of 10 March 2023. Municipalities proposed them from 2024, then the prefecture's referent adopted them.

  • My land is in an acceleration zone: what changes?

    It is a positive signal from the municipality for a solar project, valued by developers. The project still needs its permits and a grid connection.

  • My land is outside any acceleration zone: is a project impossible?

    No. A project can go ahead outside an acceleration zone if it meets planning and environmental rules. A zone helps, it is not required.